Location
Levice
Country
Slovakia
Control of lighting in manufacturing hall

In manufacturing hall of company Serioplast in city Levice in Slovak Republic, there have been in 2014 renewed lighting system and original classic lights were exchanged by LED lights ALBEO 147W, controlled by our control system Tecomat Foxtrot. Installation of this pilot project was done by company Light Project, s.r.o. The owner of the hall, company Serioplast was very satisfied with the result of implementation.

Employes of the company felt very positive the change – they got sharp white non-dazzling light, different from the old one in other plants of company Serioplast. The users have possibility of automated control of lighting according to time schedules and sensors of lighting and motion. In time settings they create time schedules for all parts of the hall. System takes in control changing time of sunrise and sunset. With DALI bus and presence sensors Foxtrot can control addresses of each light.

Very surprising was metering and comparison of energy consumprion between the old lighting system and the new one controlled by Foxtrot. After few months of operation the owner calculated that the return of investment into the new lighting system and control system is less than two and half year.

That´s why it´s not surprising that company Serioplast is now planning changing of lighting systems in other halls. And they are sure it will be again with system Foxtrot.

More references
This website uses cookies
We use cookies to ensure the proper functioning and security of our website, therefore the best possible experience when visiting. You can set your cookies later at any time. Learn more about Cookies
Settings
On this page, you can set consent for individual purposes of generating and using cookies. Learn more about Cookies
They ensure that this site works properly and securely on all devices.
Analytical cookies make it possible to gather statistics about the use and traffic on our website, so we can make it better.